Getting started

From first call to go-live, every step is small and reversible.

An MES project rarely fails because of the software. It fails when assumptions meet the real plant. So we start with the plant.

In short

Start with a Workshop Assessment. Add a Proof of Concept on your own line if you want proof. Then a fixed-price implementation, and a licence that starts at go-live.

Four steps. A go or no-go decision after each one.

You never commit to the next step before the last one has proven itself.

  1. 1 Workshop Assessment We map your processes, systems, machines, data and people, on site. About 9 days on site
  2. 2 Optional Proof of Concept Your equipment, your data, one or two real lines. Success criteria agreed in writing. 4 to 8 weeks
  3. 3 Implementation One-time, fixed price, paid across four milestones. The last needs your key users' sign-off. Fixed scope, fixed price
  4. 4 Go-live and licence Your first licence year starts at go-live, not at signing. Hypercare comes first. 30 days of hypercare included

A conversation gives you an estimate. An assessment gives you evidence.

Without an assessmentWith a Workshop Assessment
Starting point Assumptions from meetings and demos Evidence from your actual plant
Scope High-level requirements Processes, systems, machines, data and people mapped
Master data Readiness assumed Readiness measured, gaps named
Implementation price Budgetary estimate Fixed scope, fixed price
Risks Found during the project Found before you commit

The assessment belongs to you, whether or not you go ahead.

  • Current-state assessment Your plant documented: processes, systems, connectivity, data and gaps.
  • MES Readiness Scorecard Process, data, integration, technology and organisation, measured.
  • Implementation basis Scope, priorities, dependencies, risks and the capabilities you actually need.

Three typical project shapes.

Exact timing comes from your assessment. These are the usual ranges.

  • About 12 weeksSingle-site execution One plant: execution, traceability and the operator layer.
  • 16 to 26 weeksFull operational platform Adds scheduling, maintenance, assets and OEE (Overall Equipment Effectiveness).
  • Template, then fasterMulti-plant rollout One template plant, then each further site with configuration promoted.

Frequently Asked Questions

Can we get a price before the assessment?

Yes, a budgetary range. A fixed price needs real information from your plant, which is what the assessment collects.

Do we have to do the Proof of Concept?

No. It is optional. It makes sense when there is a specific technical or operational risk you want to see solved on your own line first.

What happens if the Proof of Concept doesn't meet the criteria?

The licence lapses and there is no further obligation, in either direction.

When does the licence start?

At go-live. If you sign after a Proof of Concept, its licence is extended at no charge until you go live.

Terms on this page(2)
MESManufacturing Execution System
The system that runs and records production on the floor: orders, materials, steps, quality and machines.
OEEOverall Equipment Effectiveness
Availability × performance × quality: how much of the planned time turned into good product.
See the full glossary →

See VECHR MES on your own process.

A walkthrough built around how your plant runs. Not a generic demo.