The manufacturing terms on this site, spelled out.
Every acronym and standard we use, in one sentence each. Pages link here from their own short list of terms.
Look a term up by its letters. Each entry gives the full name and what it means on the plant floor.
Production and materials
- BOM Bill of Materials
- The list of materials, and how much of each, needed to make one product.
- CIP Clean-in-Place
- Cleaning tanks and pipes without taking the equipment apart.
- DBR Drum-Buffer-Rope
- A scheduling method that paces the whole line to its bottleneck (the drum).
- DRI Direct Reduced Iron
- Iron ore reduced to metal without melting. Fed to the furnace alongside scrap.
- EAF Electric Arc Furnace
- The furnace that melts scrap and DRI into liquid steel with an electric arc.
- FEFO First Expired, First Out
- Use the material that expires soonest first.
- FG Finished Goods
- The packed product, ready to ship.
- FIFO First In, First Out
- Use the material that arrived first, first.
- FMCG Fast-Moving Consumer Goods
- Everyday products that sell fast: food, drinks, personal care, home care.
- KPI Key Performance Indicator
- A number the team is measured on, such as OEE or yield.
- MTBF Mean Time Between Failures
- The average running time between one breakdown and the next.
- MTTF Mean Time To Failure
- The average running time before a part fails, for parts that are replaced rather than repaired.
- MTTR Mean Time To Repair
- The average time it takes to get a machine running again after a breakdown.
- OEE Overall Equipment Effectiveness
- Availability × performance × quality: how much of the planned time turned into good product.
- PE Polyethylene
- A plastic film, often the sealing layer in flexible packaging.
- PET Polyethylene Terephthalate
- A clear, strong plastic film, often the printed layer in flexible packaging.
- PM Preventive Maintenance
- Maintenance done on a schedule, before the machine breaks.
- PVC Polyvinyl Chloride
- The plastic film blister packs are formed from.
- SFG Semi-Finished Goods
- Product that is made but not yet packed, such as noodle block before packing.
- SKU Stock Keeping Unit
- One sellable product variant, such as one flavour in one pack size.
- SLED Shelf Life Expiration Date
- The expiry date SAP carries for a batch.
- SSCC Serial Shipping Container Code
- The 18-digit GS1 number that identifies one pallet or shipping unit.
- WIP Work in Progress
- Material that has started production but is not finished yet.
Quality
- AQL Acceptable Quality Limit
- The highest defect rate a sampling inspection still accepts for a lot.
- CAPA Corrective and Preventive Action
- The follow-up to a deviation: fix the cause, then stop it happening again.
- CCP Critical Control Point
- A step where a hazard must be controlled for the food to be safe, such as frying temperature. Part of HACCP.
- COA Certificate of Analysis
- The test results that come with a lot, from the supplier or the lab.
- HACCP Hazard Analysis and Critical Control Points
- A food-safety system: find the hazards in the process, then control them at fixed points (CCPs).
- IPC In-Process Control
- Tests taken during production, such as tablet weight or hardness.
- LOD Loss on Drying
- A moisture test: weigh, dry, weigh again.
- NC Non-Conformance
- A record that something did not meet its specification, with what happens to it next.
- QA Quality Assurance
- The team that releases product and owns the quality system.
- QC Quality Control
- The team, usually the lab, that tests samples against specification.
- QMS Quality Management System
- The procedures and records a company runs quality by, such as deviations, CAPA and change control.
- SPC Statistical Process Control
- Charting measurements over time to catch drift before it becomes a reject.
Compliance and validation
- 21 CFR Part 11 Title 21 Code of Federal Regulations, Part 11 (US FDA)
- The FDA rule for electronic records and electronic signatures: who did what and when, changes that stay visible, and signatures bound to the record they sign.
- BPOM Badan Pengawas Obat dan Makanan
- Indonesia's food and drug regulator. It inspects factories against CPOB.
- CPOB Cara Pembuatan Obat yang Baik
- Indonesia's Good Manufacturing Practice for medicines, enforced by BPOM.
- CSV Computer System Validation
- Documented proof that a computerised system does what it should, for its intended use.
- EBR Electronic Batch Record
- The full record of one batch (materials, steps, checks, signatures) kept electronically instead of on paper.
- eDHR Electronic Device History Record
- The same history as an EBR, kept per serialised unit instead of per batch.
- FDA Food and Drug Administration (US)
- The US regulator for food and medicines. It publishes 21 CFR Part 11.
- GAMP Good Automated Manufacturing Practice
- ISPE guidance for validating computerised systems by risk and by category.
- GMP Good Manufacturing Practice
- The rules that make sure products are made consistently and to quality standards.
- IQ Installation Qualification
- Proof that a system is installed as specified. The first of IQ, OQ and PQ.
- OQ Operational Qualification
- Proof that a system works as specified across its operating range.
- PQ Performance Qualification
- Proof that a system performs consistently in real production use.
- SHA-256 Secure Hash Algorithm, 256-bit
- A fingerprint of a record. Change one character and the fingerprint no longer matches.
- URS User Requirement Specification
- The document that says what the plant needs a system to do. Validation tests against it.
Systems and integration
- API Application Programming Interface
- The way one system calls another, such as SAP sending orders to VECHR MES.
- ERP Enterprise Resource Planning
- The company system for orders, stock, purchasing and finance, such as SAP.
- EWM Extended Warehouse Management
- SAP's warehouse module.
- GS1 GS1 standards
- The global body behind product barcodes and identifiers such as GTIN and SSCC.
- HMI Human-Machine Interface
- The screen on a machine that the operator uses to run it.
- ISA-95 ANSI/ISA-95 (IEC 62264)
- The international standard for connecting business systems with plant control. It defines levels 0 to 4; MES sits at level 3.
- LIMS Laboratory Information Management System
- The lab's own system for samples, tests and results.
- MES Manufacturing Execution System
- The system that runs and records production on the floor: orders, materials, steps, quality and machines.
- MM Materials Management
- SAP's module for materials, stock and purchasing.
- Modbus TCP Modbus over TCP/IP
- A long-established industrial protocol, carried over an Ethernet network.
- MQTT Message Queuing Telemetry Transport
- A lightweight publish/subscribe protocol for sending machine data.
- OPC UA OPC Unified Architecture
- The open standard for reading data from PLCs and machines securely.
- OT Operational Technology
- The hardware and software that run machines and processes: PLCs, SCADA, sensors.
- PLC Programmable Logic Controller
- The industrial computer that controls a machine and holds its live values.
- PP Production Planning
- SAP's module for production orders and planning. PP-PI is the process-industry variant.
- QM Quality Management
- SAP's quality module: inspection lots, results and usage decisions.
- RBAC Role-Based Access Control
- Access granted by role (operator, QA, admin) instead of person by person.
- SAP SAP ERP
- The ERP most large Indonesian manufacturers run. S/4HANA is its current generation.
- SCADA Supervisory Control and Data Acquisition
- The system that monitors and controls machines in real time, one level below MES.
- SD Sales and Distribution
- SAP's module for sales orders and deliveries.
See VECHR MES on your own process.
A walkthrough built around how your plant runs. Not a generic demo.